Real engagements, real numbers where we can publish them, anonymized where we can't.
We started with the AGV vendor's signaling requirements and worked backwards: latency budget, packet loss tolerance, handover frequency, and the cell-edge SINR the radios needed to maintain. We then r…
We re-walked the building rather than starting from the prior consultants' reports. The measurement walk identified three previously unrecognized RF absorbers — an addition-era lead shielding in radio…
We ran a peak-hour measurement walk — the first one the building had ever had — and identified that the integrator's design used a channel plan that, at scale during peak, was driving every device in…